Project extension of Qingdao Hengyuan are done for added one(1) set of 130t / h sub-high temperature high-pressure circulating fluidized bed boiler(CFB) in 2006, and 2010 respectively, which also included totally five sets fluidized bed boiler flue gas desulphurization facilities. The projects have been put into operation and are running well currently. Po