Case
港宝典资料大全2022 0531-88112339
港宝典资料大全2022 0531-88112337
港宝典资料大全2022 [email protected]
Case Work
Bandung 1x30MW Thermoelectric Power Plant in Indonesia
  • Case Name:Bandung 1x30MW Thermoelectric Power Plant in Indonesia
  • Case Category:Case Work
> Contact Us
  • Overview
  • Parameters
New project-2x90t/h sub-high temperature, high-pressure direct firing pulverized coal boiler, 1x30MW extraction-condensing steam turbine & generator unit. Project was put into operation in late 2006.
 
Pulverized Coal/ PC Boiler: UG-90/5.3-M, 5.3MPa, 485 ℃, Wuxi Huaguang Boiler Co., Ltd. 
Turbine: C25-4.9/0.981, Nanjing Turbine Group
Generator: QFW-30-2C, Nanjing Turbine Group
济南网站建设 济南网站制作 网站建设 网站制作
_×